Two homes on one Altadena lot under California's SB 9 — a 2,200 sq ft main house and an 870 sq ft second home, from entitlement through finished build.
Main residence — front elevation at dusk
Pursuant to California's SB 9, the Fair Oaks lot was developed with two independent homes — a 2,200 sq ft main house and an 870 sq ft second home — delivering multi-generational living and long-term rental flexibility on a single parcel.
Phillips Group led the project from first sketch through final walkthrough — coordinating architecture and interior design, structural engineering, city permitting, and construction. Processing the SB 9 entitlement is a specialty trade that can cost $50,000–$80,000 on its own; managing it alongside design and construction kept the two-home build on one predictable schedule.
Every Phillips Group project moves through the same four phases — with one point of contact accountable start to finish.
Site study, floor plans, and elevations for both homes — plus interior direction and material selections locked before a shovel hits the ground.
Structural engineering, Title-24 energy compliance, and the full SB 9 entitlement and city permitting process — managed so timelines stay predictable.
Foundation, framing, mechanical/electrical/plumbing, and the exterior envelope for two structures — managed and closely supervised on a single coordinated schedule.
Cabinetry, tile, lighting, landscape and hardscape, final inspections, and a clean handover of a move-in-ready home and income-ready ADU.












Whether it's a custom home, an ADU, or both on one lot — Phillips Group can take it from first drawing to final walkthrough.